ADU Feasibility Checklist: Pre-Qualify Your Lot in 10 Minutes
Self-Check | Qualify | Next Steps
Before you book a full feasibility study, request this 10-minute check
This checklist covers the same ground our team checks first: ownership, zoning, space, parking, utilities, and budget. Answer honestly — every “no” or “not sure” is exactly what the full feasibility study is designed to resolve.
1. Ownership & Basics
- I own the property (or am buying it with a closing date).
Renters can’t permit an ADU — ownership or a purchase contract is step zero. - The property is a single-family home, not a condo or townhome with shared walls.
Condos and townhomes have HOA and structural barriers that usually rule out ADUs. - I know my lot size (check your appraisal district records if not).
Most San Antonio lots that fit ADUs are 5,000+ sq ft — smaller lots need a closer look at setbacks.
2. Zoning & Rules
- My lot is zoned residential (single-family or mixed residential).
San Antonio’s development code governs where ADUs are allowed — most single-family districts permit them with conditions. - I’ve checked — or will check — my HOA’s CC&Rs for ADU restrictions.
In newer subdivisions the HOA is often a bigger hurdle than the city. Some prohibit ADUs outright. - No deed restrictions or historic-district rules obviously block new structures.
Historic districts and old deed restrictions can add approvals or prohibit ADUs entirely.
3. Space & Placement
- I can picture where the ADU would sit: backyard, garage, attached addition, or above the garage.
Having a placement in mind focuses the whole study — and each type has different rules. - There’s roughly 4+ feet of clearance available on the sides and rear where a structure would go.
San Antonio typically requires ~4 ft side/rear setbacks for accessory structures. Tight lots need measuring. - If converting a garage: it’s a real enclosed garage, not a carport.
Carports usually can’t convert as-is — they lack the enclosed, permitted structure a conversion needs.
4. Parking & Access
- I have a plan for the cars — driveway space, street parking, or a new pad.
Garage conversions remove covered parking, and reviewers flag site plans with no replacement plan. - Street parking is allowed on my street (no HOA or city ban).
If street parking is restricted, the parking plan has to work entirely on your lot. - Construction equipment could reach the build area (no landlocked backyard).
A backyard with zero access for equipment turns a simple build into an expensive one.
5. Utilities
- My electrical panel has room — or I’m open to a panel/service upgrade.
An ADU needs real power. Upgrades are common and plannable — surprises are what cost money. - I roughly know where my sewer line runs (or it’s close to the build area).
Long sewer runs across a deep lot mean trenching costs. Short runs keep budgets honest. - Water and gas can reach the ADU location without crossing a neighbor’s property.
Crossing property lines for utilities triggers easements — solvable, but it must be planned.
6. Budget Readiness
- I have a realistic budget range in mind for the project.
Detached casitas, conversions, and additions price very differently — a range lets us match the ADU type to the money. - I’ve thought about how I’d fund it: savings, HELOC, or renovation loan.
Financing shapes the timeline. Our financing guide walks through the common routes. - I understand permits and design take months — I’m planning ahead, not rushing.
The number-one timeline killer is starting design before feasibility. You’re already ahead by reading this.
Your Score
How did your lot do?
Mostly yes — you’re a strong candidate
Book the full feasibility study and we’ll verify everything above against your parcel’s actual records, then give you a buildable plan with budget and timeline.
A few “not sure” — that’s normal
The “not sures” are exactly what the study resolves: we pull zoning, measure setbacks, check HOA documents, and map utilities so you decide on facts, not guesses.
Several “no” — let’s talk anyway
A “no” isn’t always a dead end — setbacks can be designed around, panels can be upgraded, parking can be replanned. Bring us the nos and we’ll tell you honestly which are solvable.
Ready for the full picture? Start your feasibility study.
Ten minutes with this checklist. Days for our team to verify it all against your lot’s real records.
Prefer to read first? See ADU Feasibility San Antonio: 7 Checks Before You Build and our feasibility process.