Free Report | Lot-Specific | No Obligation
Most contractors quote you blind. The Carson Custom Homes team checks your lot first.
Before we talk numbers, we run a pre-feasibility report on your actual property — zoning, setbacks, flood zones, wetlands, wildfire exposure, and size limits, all checked against public records and parcel data. It’s the homework most contractors skip — and it’s why our ADU projects don’t stall in permitting.
Before you choose a floor plan, find out what your property can accommodate. Request your free, property-specific ADU pre-feasibility report from Carson Custom Homes.
What the report tells you
Whether your lot can legally hold a detached ADU — plus the details that decide the design: applicable zoning (or lack of it), setback requirements, FEMA flood zone status, wetlands or protected areas, wildland-urban interface exposure, and any size or footprint limits. Every finding cites its source, from FEMA maps to county parcel records.
Why other contractors skip this step
Most builders start with a floor plan and a price — then discover the lot problems during permitting, when changes cost real money. We flip that order: verify the lot first, then design with confidence. It’s a small upfront step that prevents the most expensive surprises in ADU construction.
Read: ADU Feasibility San Antonio — 7 Checks Before You Build
The Carson WAY
What a Pre-Feasibility Report Changes
Inside The Report
Multiple sections, one clear verdict
1. Allowability
Zoning jurisdiction, parcel data, lot size, existing structures, and impervious coverage — the baseline: can a detached ADU go here at all?
2. Special considerations
Coastal zones, wetlands, FEMA flood zones, and wildland-urban interface exposure — each marked detected or not detected, with sources cited.
3. Size limitations
Whether any zoning cap constrains your ADU’s floor area, floor-area ratio, or footprint — so the design starts at the right size.
4. Placement & setbacks
Required front, side, and rear setbacks and the buildable area left inside them — where the ADU can actually sit on your lot.
5. Local guidance
Plain-English notes on your jurisdiction — unincorporated areas, ETJs, and deed restrictions included — plus what still needs professional verification.
Get your FREE pre-feasibility report.
AFTER The Report
Once the project has a green light.
Once the feasibility check list makes your ADU a green lit project to build, the design process can begin.
We begin with Design
During this phase, our skilled design team creates detailed CAD drawings that outline the proposed ADU, including precise measurements and specifications. This enables you to visualize how your property will appear upon completion.
Permits
Following the design phase, our team takes on the responsibility of securing all necessary construction permits. This phase may require patience due to the various permits required for ADU construction.

